OmniPlan 1.1 adds PDF export, task and resource HTML reports, and addresses some bugs and usability issues:

• Documents can now be exported or printed from the document picker in Edit mode. Supported formats so far are PDF, HTML, and of course OmniPlan.

• Fixed some Gantt drawing alignment issues when a baseline is being displayed.

• Improved clarity of the calendar exceptions list, making it easier to see which days have exceptions.

• Revised the OmniPlan Server Repository interface.

• OmniPlan now respects explicit HTTP server ports for WebDAV accounts.

• The effort for new tasks now defaults to the number of hours in a day specified in project effort conversions.

• Fixed a WebDAV sync compatibility issue with http://livedisk.df.eu/.

OmniPlan for iPad 1.0.2

June 22, 2012

OmniPlan 1.0.2 is a minor update addressing the most common and critical issues reported by our users:

• Schedule calendars now correctly honor the Region Format with respect to the first day of the week.

• Fixed a task duplication problem. Using change tracking to reject the insertion of tasks, then undo to reverse the rejection could cause sync to create duplicates of the tasks.

• All rendering when the Gantt view is zoomed out is now sharp and clear.

• The completion slider now skips over the dead zone in the middle of split tasks.

• When the effort/duration keyboard is visible, the steppers in the field being edited will increment the units selected on the keyboard.

• While dragging a dependency, the controls on the selected task are now hidden.

• If there is no selection, the scale popover no longer includes the option to “Scale to Fit Selection”.

• When you begin dragging the duration of ALAP tasks, the length no longer changes to 0.

• Dependency lines are now more visible in the light theme.

• Fixed a date caching error for dates before the Gregorian calendar was adopted in 1582.

OmniPlan for iPad 1.0.1

May 16, 2012

Welcome to OmniPlan for iPad!

OmniPlan for Mac 2.1.2

May 1, 2012

  • It seems as if our fix to the Task: Schedule inspector in 2.1.1 actually caused more widespread crashes. We've rewritten this code in a more robust fashion and have not seen the problem reoccur.
  • Text to the left and right of Gantt bars should now line up on the same baseline without clipping font descenders.
  • The “Include Notes” checkbox on the image export sheets is now correctly honored.
  • Added support for including project level custom data in HTML exports.
  • Fixed an error that caused “Open From Server Repository” to fail on published plans with a baseline.

OmniPlan for Mac 2.1.1

April 19, 2012

  • Increased the minimum OS version requirement to Snow Leopard 10.6.8.
  • Restored support for 32 bit processors.
  • Fixed alternating row colors in the outline views on printouts and exported images.
  • If the Java Microsoft Project import tool fails, the Send Feedback button that comes up now sends us its log, rather than terminating the application and sending us a backtrace of the current state.
  • Changing the type of a resource via the context or gear menu no longers crashes under non-English localizations.
  • In most localizations, the effort units checkboxes on the Project: Formats inspector overlapped in 2.1 such that when you click one, you usually hit the one below it. This has been fixed in 2.1.1.
  • Fixed localizations of effort/duration units in some translations. Most notably for example, “4j” when running the French localization no longer comes up with “4h”.
  • The new Microsoft Project Import/Export code requires a 64 bit architecture. OmniPlan will fall back to the old code even if you request the new code via the UseNativeMSPFilters user default.
  • Fixed crash in the Task: Schedule inspector.
  • Fixed a crash paginating the resource view.