Tasks have a priority setting which assists in leveling
Behavior of the enter key is now user configurable
Notes from OmniPlan can now be exported to iCal and included in HTML exports
Mini-Manual now available through the Help menu
The Show Overview command in the View menu provides an abstract view of all top-level tasks and groups in the project
Showing dates on milestones in the Gantt chart is now a separate View Options setting from showing assigned resources on tasks
When you drag tasks, they now snap to time units based on the zoom level
Duration and Effort totals added to the list of things that appear when left clicking at the bottom of the main window
Major Fixes
Importing
We've fixed a number of issues related to importing and exporting MS Project files. While we have fixed some problems, we know we still have more work to do, so please keep sending us bug reports!
Leveling
New leveling algorithm
The new leveling algorithm is faster, produces fewer hangs and behaves more predictably.
The details are:
Order tasks by priority then by position in the outline
From lowest priority up, position any tasks with absolute end limits (meaning they are locked or have an end constraint or are a prerequisite to another task which is locked or has an end constraint) as _late_ as it is possible for them to fit, so as to reserve worst-case space.
From highest priority down, position tasks as early as allowable and will fit. This includes all the tasks in step 2 as well, which may be moved earlier because of this. If any tasks fail to fit at all, save them for later.
With only remaining 'failed' tasks, from highest priority down, perform the same operation as in step 3. Some may fit now because a lower priority task with a reserved position in step 2 may have moved during its part of step 3. While any tasks are able to be positioned, repeat step 4 again with remaining failed tasks.
Calendar
Moving time blocks in the work schedule no longer misbehaves
Fixed crash when pushing arrow keys in Calendar Mode
Modifying time blocks no longer causes them to disappear
AppleScript Dates
The OmniPlan AppleScript library now handles NSDates correctly
Inspecting Multiple Tasks
It is now possible to edit multiple tasks at the same time
HTML Templates
Standardized and cleaned up the HTML in exported projects
Exporting resource information is more configurable
CSS for our exported HTML has been moved to a separate file
HTML exports are more compatible with Firefox and IE
Overhauled print options
OmniPlan's print settings now accept 2-digit months
Minor Fixes
Option-clicking a group in the Gantt view will now expand all hidden children
Resources no longer disappear from calendar view if you make the window tiny and resize it up again
A group's completion percentage now updates immediately when adjusting a subtask
Grouping tasks will now renumber properly
Assignment pane of the Task inspector now shows all resources
Users can now convert between task, group, and milestone from the contextual/action menu
The changes in this new release will get me to try it out again. I couldn't use the previous releases because of the lack of “priority hints” for leveling.
Download in progress….......
Claire
09.29.06 8:04 PM
Yay! This version not only doesn't crash when I try to level a project, but it completes the levelling in just a couple of seconds.
Hi. This is a desperate attempt to get my feature on the “to do” list: Make it possible to work with projects and task lasting thousands, nay, millions, oh hell, BILLIONS of years. Whatever for? Think planning a historical novel. Think creating a timeline of the evolution of the universe (or even the evolution of, say, snails). We need it!
Commenting is not available in this section entry.
-
-
-
-
-
Commenting is not available in this section entry.JohnB
09.27.06 8:51 AM
Claire
09.29.06 8:04 PM
Jeffrey Cannon
10.03.06 6:47 AM
James
10.03.06 7:01 AM
G R Lewis
10.04.06 3:16 AM